Skirting for contractors and floor fitters: outsourcing the finish to a specialist

    Costs & process · 6 min read

    Newly laid light floor in an empty new-build home with crisply fitted white skirting boards along the walls

    As a contractor or floor fitter, you can outsource the skirting to TipTop Plinten: a finishing specialist who steps in after the floor, fits the skirting to measure, takes care of corners and junctions and, if required, includes the caulking, paint-ready or directly in colour. We work with MDF, moisture-resistant MDF, solid wood and aluminium, in any RAL colour, on herringbone, vinyl, laminate, parquet and tiled floors. TipTop Plinten is based in 's-Hertogenbosch and works throughout the Netherlands. The quote is free.

    Below you can read how the collaboration works in practice and what you can supply in advance.

    Why outsource the skirting?

    Skirting is the last thing the client sees, and often the first thing they notice. A gap above the skirting, an open mitre or a messy caulk line stands out at handover, even if the rest of the work is good. At the same time it is a specialist task: precise cutting, fitting to uneven walls and neat caulking take time and routine.

    By handing skirting installation to a specialist:

    • your own team stays free for other work;
    • the finish lies with one party, including the caulking;
    • you get made-to-measure work for irregular walls, alcoves and corners;
    • the skirting fits the floor that you or the floor fitter has laid.

    How does TipTop Plinten fit into your schedule?

    After the floor

    The skirting comes after the floor, because it covers the edge and the expansion gap. For floor fitters, that means: as soon as the floor is down, the skirting can follow. That way the gap is covered neatly straight away.

    Around the painting

    Whether the walls are painted before or after the skirting varies by project. A common sequence is: paint the walls, fit and caulk the skirting, then a final coat along the caulk line. With pre-finished skirting that last step is often smaller. This is agreed in advance with the painter.

    Thinking along from the shell stage

    In new builds it helps to include the skirting early in the schedule, for example for the choice of material, height or a shadow gap skirting that belongs with the wall finish. At the new-build home in Boxtel, skirting installation was included from the shell stage, including caulking. In skirting boards in a new build you can read more about the order of work.

    How much time installation takes on a project depends on the number of metres, corners and rooms and on the substrate. This becomes clear with the quote and in discussion about the schedule.

    Stack of white MDF skirting boards cut to size on a protected new floor, ready for installation

    What does TipTop Plinten take care of?

    PartExplanation
    Skirting installationMDF, moisture-resistant MDF, solid wood or aluminium
    Made-to-measure workUneven or irregular walls, unusual corners, mitres
    CaulkingJoint between skirting and wall, paint-ready or in colour
    ColourAny RAL colour, for example RAL 9010 or RAL 9005
    MouldingsArchitraves, decorative mouldings, coving and wall panelling

    Plastic skirting boards are deliberately not fitted.

    Floor types

    We join skirting to herringbone, vinyl, laminate, parquet and tiled floors. The junction differs for each floor type: a floating floor must not be fixed to the skirting, while a glued-down vinyl floor or tiled floor calls for a different finish along the bottom. You can see how skirting joins a vinyl herringbone floor in the apartment in Rotterdam.

    Moisture-prone rooms

    In rooms where moisture occurs more often, such as a utility room or toilet, moisture-resistant MDF can be used. Agree this in advance, so the right material is ordered.

    Caulking from one source

    The caulking can be included with installation. The joint between skirting and wall is sealed with paintable acrylic caulk, and mitres and fixing points are touched up. Read more on our caulking service page.

    Bottlenecks in the finish, and how to avoid them

    Many problems with skirting do not arise during installation itself, but in the run-up to it. A few well-known bottlenecks:

    BottleneckHow to avoid it
    Skirting fixed to a floating floorFix the skirting to the wall, leave the floor free
    Expansion gap too wide for the chosen skirtingMatch the skirting thickness to the gap the floor fitter leaves
    Plaster or screed not yet dryRespect the drying times of the plasterer and floor layer
    Colour or sheen differs from the doorsSpecify one RAL number and sheen level for all woodwork
    Pipes or cables low in the wallPass on their position in advance and adapt the fixing method

    By discussing these points in advance, the skirting fits in with the work of the other trades and you avoid remedial work just before handover.

    What can you supply for a quote?

    The more complete the information, the more accurate the quote:

    • the project location and type of project (new build, renovation, apartments, commercial building);
    • the number of homes or rooms;
    • an estimate of the number of running metres, or drawings from which they can be derived;
    • the floor type and who is laying the floor;
    • material, height, profile and colour of the skirting;
    • whether caulking, architraves or other mouldings should be included;
    • the desired schedule and any fixed handover dates.

    If the situation is difficult to assess remotely, an on-site measurement is possible. It costs €75 incl. VAT and is credited as a discount on jobs above a minimum project size.

    Communication and service area

    You deal directly with TipTop Plinten, via WhatsApp, phone or email. We usually respond within 24 hours. Communication is possible in Dutch, English, German, Turkish, Persian and Arabic, which can be handy on projects where different crews work together.

    The base is 's-Hertogenbosch, but we work throughout the Netherlands. Previous projects include Boxtel, Oss, Rotterdam, Monster, Leerdam, Apeldoorn and Maastricht.

    Also for interior fit-out companies and commercial projects

    Besides contractors and floor fitters, TipTop Plinten works for interior fit-out companies and hotels. There it is often about skirting combined with wall panelling, decorative mouldings and architraves. Read more in mouldings for hotels and commercial projects. You can find the general way of working in skirting board installation: the process.

    Working together on your next project?

    Take a look at our skirting board installation service or send the project details, drawings or photos and your schedule via the contact page. You can also call or WhatsApp +31 6 28438086, or email info@tiptopplinten.nl. The quote is free and without obligation.

    Frequently asked questions

    Yes. Besides private clients, TipTop Plinten works for contractors, floor fitters, interior fit-out companies and hotels. The work covers skirting installation, architraves, decorative mouldings, wall panelling and caulking.

    After the floor has been laid and preferably after the wall finish. The skirting covers the edge of the floor and the expansion gap. Whether painting comes before or after the skirting is agreed per project.

    Useful details are the location, the number of homes or rooms, an estimate of the running metres, the floor type, the preferred material, the height and colour of the skirting, and the desired schedule. Drawings or photos help us quote accurately.

    It can be. Caulking and finishing can be included with installation, paint-ready or directly in colour. That way no extra trade needs to be scheduled for the joints.

    Yes. The base is 's-Hertogenbosch, but we work throughout the Netherlands. Previous projects include Boxtel, Oss, Rotterdam, Monster, Leerdam, Apeldoorn and Maastricht.

    Related articles

    Related

    Skirting board installation? Request a free quote

    On-site measurement €75 incl. VAT (credited for orders above a minimum project size)